Travel & Stay

Construction begins on Expo 2030 Riyadh Metro station on Yellow Line

Linking the King Khalid International Airport to the heart of the Kingdom’s capital, the Royal Commission for Riyadh City’s latest transit landmark pairs high-capacity mobility with acacia-inspired design and a planned 44,000 square metres of landscaped greenery

BY /
18 November 26
RCRC & SPA
The new Riyadh Expo 2030 Metro Station has been designed to move up to 19,000 passengers per hour
RCRC & SPA

As Riyadh accelerates toward one of the most defining decades in its urban history, the journey to Expo 2030 is already taking sculptural shape.

The Royal Commission for Riyadh City (RCRC) has officially broken ground on a modern, architecturally-led metro station dedicated to serving the Expo 2030 site. Slated to open ahead of Expo 2030, the new metro station has been carefully designed to move up to 19,000 passengers per hour.

Design Rooted in the Landscape

Riyadh Expo Metro Station


The Expo 2030 metro stop will be a new addition to the Riyadh Metro’s Yellow Line, offering users direct connectivity to and from King Khalid International Airport.

Positioned on King Salman Road, within a landscaped green corridor bridging the Expo 2030 Riyadh grounds to the east with emerging urban districts to the west. Rather than functioning purely as a utilitarian transit hub, the structure has been conceived as a permanent civic landmark designed to anchor the capital’s northern growth long after the global exhibition concludes.

IG: RCRC

Spanning roughly 70,000 square metres, the station’s defining visual signature is an expansive 134-metre-wide steel dome that casts generous shade across visitor walkways below. Supported by eight branching columns modelled on native acacia trees, the canopy draws directly from the organic geometry of Riyadh’s natural valleys and desert flora.

Sustainability is woven just as deliberately into the blueprint. Approximately 44,000 square metres of landscaped green space will wrap around the hub, softening the transition between rail infrastructure and public realm, while integrated solar energy is projected to supply around 25 percent of the station’s power requirements.

You Might Also Like: France becomes first country to sign Expo 2030 Riyadh participation contract

Built for Riyadh’s Global Decade

Timed to progress in tandem with the broader Expo 2030 masterplan, the station is scheduled for completion ahead of the international  opening. Throughout the build, works will follow a coordinated traffic management plan incorporating alternative routes to keep surrounding neighbourhoods and arterial roads moving smoothly.

The project also reflects a wider, long-horizon investment in the capital’s mobility network. Following the commission’s recent procurement of 94 new trains, the station forms a vital link in preparing Riyadh’s transit backbone not only for Expo 2030, but also for the 2034 FIFA World Cup and the everyday rhythm of a rapidly expanding metropolis.


rcrc.gov.sa
@rcrcsa